4.
Installation Method (Existing Walls)
®
1. ESP Low-E Housewrap is installed over exterior wall
sheathing, make sure reflective side faces out: foil flange
faces down.
®
2. Determine width of ESP Low-E HouseWrap being used
( 4’,5’, 6’) for initial wrap ( lowest point of wall surface )
3. Measure from sill plate up the wall, mark wall
at level of determined width less 1”
®
i.e. 5’ ESP Low-E HouseWrap mark at 59”
4. Snap chalkline around perimeter
5. Starting at the corner of the preferred exterior wall
®
unroll ESP Low-E Housewrap in a horizontal manner.
Fasten using corrosion resistant staples having
minimum 1” wide crown, corrosion resistant nails
having minimum 3/8” heads or corrosion resistant
nails having minimum 1” diameter plastic heads.
Fasteners to be spaced a maximum of 16” both
vertically and horizontally.
®
6. When rolling ESP Low-E Housewrap over door and
window openings: If windows and doors have been set,
®
trim ESP Low-E HouseWrap as close to window or
door opening as possible and perform detailing as
per door / window manufacturer and or code
standards.
®
7. The bottom side of the ESP Low-E Housewrap should
extend over sill plate by minimum 1”.
®
8. When applying second horizontal run of ESP Low-E
Housewrap butt foam ends together allowing foil
flange to overlap 2”. Make certain foil flange is
to the outside to ensure water drainage plane
downward.
9.Tape all vertical and horizontal flange seam areas
with foil tape.
®
10. Continue method until ESP Low-E Housewrap covers
both top plates.
11. Use foil tape to repair areas that have been torn or
compromised.
(See page7)
12. Foil is a conductor of electricity. Use extreme
®
caution when working with ESP Low-E Housewrap
around power lines, wiring and electrical devices.
HouseWrap Applications
Flange
Tape
1. When coming to the end of existing roll in use,
leave up to 12 inches of product unattached
to wall system.
2. Remove new roll from packaging
®
3. Unroll ESP Low-E Housewrap to desired area
making sure that product is plumb and square
with housewrap already in place and also overlap
material past the end of previous material by approx
8 inches.
4. Locate center of overlapped materials and make
common splice through both layers of material using
utility knife.
5. Remove cut material from end of previous roll and
start of new roll
6. Apply Low-E Tape over common splice, then continue
®
installing ESP Low-E Housewrap as described in
Figure 1
7. If vertical splice is not performed, product must be
overlapped by minimum of 6”
Vertical Splice of Housewrap
®
ESP Low-E
End of previous roll
Common splice
Beginning of new roll
When installing Housewrap over the exterior of structure be sure to run product horizontally
over entire wall including framed openings. (please refer to page 5 for more detailed instructions)
®
ESP Low-E
Once Housewrap has been securely
fastened to exterior sheathing make cuts as
shown in Figure 2.
Try not to cut past exterior side of framed
opening (exception for top of framed opening)
but in the event that occurs use Low-E foil
tape to repair area that was compromised.
®
ESP Low-E
1. An additional flap should be cut above
the top exterior side of framed opening
for the installation of head flashing.
2. Bend flap away from
wall to allow installation
of window and flashing
3. Apply window and head flashing
Follow door and window manufacturers
instructions for flashing and installation
relating to their respective products.
Remove excess
material by
using inside
face of
stud as
cutting guide
4. Reset Housewrap and tape seams
®
ESP Low-E
Once side and bottom flaps have been cut, bend these flaps toward the interior of structure using staples
or adhesive to attach Housewrap to the face of the jamb.
®
ESP Low-E
Framed Openings
Penetration Installation Diagrams
Tears and Holes Repair
Step 1
Step 1
Step 2
Step 2
Step 3
Step 1
Step 3
Step 2
Find horizontal center
of both sides of pipe
and make a 6”cut at
approx 45° angle.
Bend flap up
Wrap around outside
diameter of pipe
using approved
flashing tape ( for
best seal use
approved caulk
around pipe prior
to flashing tape.
Bend flap back to
position and tape
using Low-E foil
tape
Place dryer vent in
designated location
allowing vent flashing
to cover housewrap
on lower half ( vent
flashing area to touch
sheathing on top half )
Place housewrap on
top of vent flashing
on top half and cut
around vent. Lift flap
created and cut off
the excess
Tape lateral seam and around
vent obstruction. For best seal
use approved caulk around
vent prior to taping.
For simple tears in HouseWrap
apply Low-E foil tape completely over torn
area and squeegee area for best adhesion
®
ESP Low-E
For larger tears and
or holes place piece of
®
ESP Low-E Housewrap over
compromised area ( Be
sure that piece being placed
on top of compromised area
is larger than damaged area )
Make common splice through
both layers.
Remove excess top layer and
compromised area that was cut out.
Place material into
opening created and
tape using Low-E foil tape
Flashing Tape
SYSTEM R-VALUE CALCULATIONS FOR THIS ASSEMBLY WERE PERFORMED BY R & D SERVICES REPORT # RD03224
System R-Value: R-4.17 Horizontal Heat Flow Only
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare