ESP EZ-WF Installationsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
Ceiling Applications
System R-Value: R- 34.70 Downward Heat Flow, R- 33.75 Upward Heat FlowSystem R-Value
System R-Value: R- 38.04 Downward Heat Flow, R- 32.87 Upward Heat FlowSystem R-Value
System R-Value: R- 29.74 Downward Heat Flow, R- 23.55 Upward Heat Flow
Ceiling Application with Low-E & Blown In Insulation
Recessed Ceiling Application with Low-E & Blown In Insulation
Suggested Cathedral Ceiling Installation
Measure entire ceiling joist area to determine square footage of Low-E Insulation required (length x width). Roll out material and
fasten to bottom of ceiling joist, stapling with 1/2” staples every 6”. To achieve a vapor barrier, all adjoining seams must be taped
securely with Low-E tape. Secure lathe strips and interior ceiling using approved application methods.
SYSTEM R-VALUES FOR THESE INSTALLATION METHODS WERE CALCULATED USING DATA FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS
Measure entire ceiling joist area to determine square footage of Low-E Insulation required (length x width). We recommend using
Low-E Insulation with tabs. Roll out tab material and fasten by recessing it 1-1/2” into ceiling joist cavity, stapling with 1/2” staples
every 6”. To achieve a vapor barrier, all adjoining seams must be taped securely with Low-E tape. Secure interior ceiling using
approved application methods.
Install 24” ESP Low-E® Tab Insulation as the baffling under wood deck to insure proper ventilation. Install fiberglass according to
manufacturers recommendation.
7.
Different climates may affect application. Refer to local building codes for placement of vapor barrier. Low-E is a vapor barrier.
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare